Shower floors slope tiling in shower recesses the minimum standard required for wet areas in residential buildings is contained in the building code of australia bca and as3740 waterproofing of wet areas in residential buildings.
Shower floor slope fix.
I just finished tiling the shower floor.
Underneath it is a mortar 1 4 per foot slope to a linear drain.
This is so that the bottom row of tile is level.
It s on the order of a teaspoon to a tablespoon each shower.
Mark off the area of the floor that you want to apply the formula.
If that is your case simply tile over tile and create the proper slope while doing so.
At the point closest to the drain the slope will be higher than the.
As a result every time we take a shower a small amount of water runs out and down the front face of the sill and if not wiped up promptly soaks into the floor.
Strike a level line all the way around the shower.
I think i m going to fix this.
The picture attached shows the floor you may or may not notice the corner of the shower floor dips a bit and levels off it does not have the proper slope from the corner down to the drain hence my need to build that up a bit to.
Clean your shower floor or tub thoroughly with a scotch brite pad and dry it completely.
I recommend taping off the rectangular area where you stand most.
Looking for some advice.
There is a single drain at the south end but the floor peaks in the middle so half the floor slopes to the drain in the south end but the floor to the north of the middle slopes to the end where there s no drain and water thus pools.
On top is a reviving old thread.
The glass door which swings in and out is centered on the sill and has a plastic deflector at the bottom so the amount of water is not huge.
The builder seller is going to fix it.
You do a run at 1 4 minimum per foot to the farthest corner.